Drilling services

SNGN ROMGAZ


Well 250 Noul Săsesc, depth 1879 m, 2024 - ongoing, drilling rig F200.

Transgex started the execution of the second well related to the project "Provisional preparatory work, drilling and production tests at exploitation wells - 2 lots - Lot 1 - Noul Sasesc 250 well and Lot 2 - Caragele 100 well".Transgex started the execution of the second well related to the project "Provisional preparatory work, drilling and production tests at exploitation wells - 2 lots - Lot 1 - Noul Sasesc 250 well and Lot 2 - Caragele 100 well".
Beneficiary SNGN ROMGAZ S.A.
The projected depth of the well is 1879 meters and it is dug with the F200 drilling rig. The project is estimated to be completed in August 2024.


Well 100 Caragele, depth 3159 m, carried out during 2023-2024, drilling rig F200.

Transgex has completed the execution of the first well related to the project "Provisional preparatory work, drilling and production tests for exploitation wells - 2 lots - Lot 1 - Noul Sasesc 250 Well and Lot 2 - Caragele 100 Well".Transgex has completed the execution of the first well related to the project "Provisional preparatory work, drilling and production tests for exploitation wells - 2 lots - Lot 1 - Noul Sasesc 250 Well and Lot 2 - Caragele 100 Well".
Beneficiary SNGN ROMGAZ S.A.
The final depth of the drilling was 3159 meters and was carried out with the F200 drilling rig between December 2023 and April 2024.


Well 1 Brădeni, depth 2009 m, completed in 2023, Bentec drilling rig.

Transgex has completed the execution of the project "Provisional preparatory work, drilling and production tests at the exploitation well 1 Bradeni".Transgex has completed the execution of the project "Provisional preparatory work, drilling and production tests at the exploitation well 1 Bradeni".
Beneficiary SNGN ROMGAZ S.A.
The final depth of the drilling was 2009 meters and was carried out with a Bentec A350 drilling rig between May 2023 and March 2024.


Well 241 Corunca SUD, depth 2208 m, completed in 2022, drilling rig F200.

Transgex has completed the execution of the project "Provisional preparatory work, drilling and production tests at the exploitation well 241 Corunca Sud".Transgex has completed the execution of the project "Provisional preparatory work, drilling and production tests at the exploitation well 241 Corunca Sud".
Beneficiary SNGN ROMGAZ S.A.
The final depth of the drilling was 2208 meters and was carried out with the F200 drilling rig between September 2021 and April 2022.


  
OMV PETROM


Well 1 Spineni, depth 4140 m, year 2024 - underway, BENTEC drilling rig.

Transgex started the execution of well 1 Spineni within the framework contract "Onshore drilling works with drilling rig having 350 mt static hook load Number 9000010641" - Subsequent Contract no.3.Transgex started the execution of well 1 Spineni within the framework contract "Onshore drilling works with drilling rig having 350 mt static hook load Number 9000010641" - Subsequent Contract no.3.
Beneficiary OMV PETROM S.A.
The projected depth of the well is 4140 meters and is made with the Bentec A350 drilling rig. The project is estimated to be completed in August 2024.


Well 4346 Mamu, depth 4160 m, completed in 2024, BENTEC drilling rig.

Transgex completed the execution of well 4346 Mamu within the framework contract "Onshore drilling works with drilling rig having 350 mt static hook load Number 9000010641" - Subsequent Contract no.2.Transgex completed the execution of well 4346 Mamu within the framework contract "Onshore drilling works with drilling rig having 350 mt static hook load Number 9000010641" - Subsequent Contract no.2.
Beneficiary OMV PETROM S.A.
The final drilling depth was 4160 meters and was carried out with a Bentec A350 drilling rig between February 2024 and April 2024.


Well 1174 Bustuchin, depth 3289 m, year 2023, BENTEC drilling rig.

Transgex has completed the execution of well 1174 Bustuchin within the frame contract "Onshore drilling works with drilling rig having 350 mt static hook load Number 9000010641" - Subsequent Contract no.1.Transgex has completed the execution of well 1174 Bustuchin within the frame contract "Onshore drilling works with drilling rig having 350 mt static hook load Number 9000010641" - Subsequent Contract no.1.
Beneficiary OMV PETROM S.A.
The final drilling depth was 3289 meters and was carried out with a Bentec A350 drilling rig between June 2023 and July 2023.


ENGAS – Slovakia


Well 3 Golianovo, depth 2600 m, completed in 2023, drilling rig TD160.



HUNT OIL


Well 3900 Macoveiu, depth 3997 m, completed in 2023, BENTEC drilling rig.